Jiangxi, China
Business Type:
Manufacturer/Factory, Trading Company
Registered Capital:
20000000 RMB
Plant Area:
501~1000 square meters
Management System Certification:
ISO 9001, ISO 9000, ISO 14001, ISO 14000, OHSAS/ OHSMS 18001
Average Lead Time:
Peak season lead time: one month
Off season lead time: within 15 workdays
OEM/ODM Service
Sample Available

Slide Bearing Pads, Pot PTFE, Bridge Bearing Replacement manufacturer / supplier in China, offering Easy Installation PTFE Pot Bearing Plate in Bridge, Dn 300mm--1200mm Underground Drain Water HDPE Double Wall Corrugated Pipe, Orange Industrial Underground Wall Mpp Pipe for Cable Protection and so on.

Gold Member Since 2018
Audited Supplier
  • Easy Installation PTFE Pot Bearing Plate in Bridge
  • Easy Installation PTFE Pot Bearing Plate in Bridge
  • Easy Installation PTFE Pot Bearing Plate in Bridge
  • Easy Installation PTFE Pot Bearing Plate in Bridge
  • Easy Installation PTFE Pot Bearing Plate in Bridge
  • Easy Installation PTFE Pot Bearing Plate in Bridge

Easy Installation PTFE Pot Bearing Plate in Bridge

Get Latest Price
Min. Order / Reference FOB Price
10 Pieces US $150-200/ Piece
Port: Shanghai, China
Production Capacity: 10000piece/Month
Payment Terms: L/C, T/T, D/P, Western Union, Paypal
Certification: GB, BS, ASTM, CNAS
Usage: Beam Bridge, Highway Bridge, Railroad Bridge
Structure: Basin Type Rubber Bearing
Material: Rubber Bearing
Activity: Multi Direction Movable Bearing
Shape: Roll/Square

You Might Also Like

Loading...

Basic Info

Model NO.
BPB033
Trademark
Jubo
Transport Package
in Pallets or Wooden Cases
Specification
200mm to 1200mm
Origin
Jiangxi, China
HS Code
7308100000

Description:
An elastomeric bridge bearing is a commonly used modern bridge bearing. There are several different similar types of bridge bearings that include neoprene bearing pads, neoprene bridge bearings, laminated elastomeric bearings and seismic isolators, which are all generally referred to as bridge bearing pads in the construction industry.

Feature:

A. Small friction coefficient.

B. Larger shear capacity.

C. Suitable for large span bridge construction.

D. Excellent buffering and shock isolation.

E. Withstand vertical load and rotation.
Easy Installation PTFE Pot Bearing Plate in Bridge
Easy Installation PTFE Pot Bearing Plate in Bridge
Easy Installation PTFE Pot Bearing Plate in Bridge
Easy Installation PTFE Pot Bearing Plate in Bridge
Easy Installation PTFE Pot Bearing Plate in Bridge
Easy Installation PTFE Pot Bearing Plate in Bridge

 

Physical Properties
Physical PropertiesCRNREPDM
Hardness60±560±560±5
Tensile Strength/Mpa ≥171815
Elongation at Break/% ≥400450350
brittleness temperature(ºC) ≤-40-50-60
EN Compression Set(70ºC*24h)/% ≤153025
Ozon Resistance(20% elongation, 40ºC*96h)100*10-325*10-8100*10-8
 Test Conditions(ºC*h)No CrackNo CrackNo Crack
 Tensile Strength(%) ≤100*7070*168100*70
Air Oven Aging(Max change, comparing withElongation at Break/% ≤151515
datas without aging)Hardness Change402040
Peel Strength between Rubber and Steel(kN/m) ≥0~+10-5~+100~+10
Peel Strength between Rubber and PTFE(kN/m) ≥101010

 

Mechnical Properties
Ultimate Compressive Strength Ru(MPa)≥70
Measure of Compressive Elastic Mould E1(MPa)E±E*30%
Measure of Shear Elastic Mould G1 (MPa)G±G*15%
Measure of Shear Elastic Mould after Aging G2 (MPa)G1±G1*15%
 Concrete Bridge≥1/300
Measure Corner Tangent tgθSteel Bridge≥1/500
Measure Friction Coefficient μf (with grease)≤0.03

FAQ:

Q: Can I have a sample?

A: Yes, it is our pleasure to send free samples for checking quality and just undertake the?freight?charge by yourself.

Q:What is the lead time for samples?

A: Current sample need 1 day, customized samples need 5-7 days,

Q:What express do you use to send the samples?

A: We usually ship samples by DHL, TNT, FEDEX and UPS. It usually takes 3-5 days to arrive.

Q:What is the payment terms?

A: Our usual payment term is T/T and L/C . Others could be negotiated.

Q:Can you produce as my drawing?

A:Yes, we can customized for you?based on your drawing or sizes.

Q:How about the delivery time?

A:Usually production time is 10-15 days. It will be decided by the order quantity.

About us:
Easy Installation PTFE Pot Bearing Plate in Bridge

Send your message to this supplier

*From:
*To:
avatar Mr. Kyrie
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now