• HDPE Pipe Fitting Electrofusion Flange Adapter Stub End
  • HDPE Pipe Fitting Electrofusion Flange Adapter Stub End
  • HDPE Pipe Fitting Electrofusion Flange Adapter Stub End
  • HDPE Pipe Fitting Electrofusion Flange Adapter Stub End
  • HDPE Pipe Fitting Electrofusion Flange Adapter Stub End
  • HDPE Pipe Fitting Electrofusion Flange Adapter Stub End

HDPE Pipe Fitting Electrofusion Flange Adapter Stub End

After-sales Service: 5 Years
Warranty: 5 Years
Head Code: Round
Samples:
US$ 2/Piece 1 Piece(Min.Order)
| Order Sample
1
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
HDPE Pipe Fitting Electrofusion Flange Adapter Stub End pictures & photos
HDPE Pipe Fitting Electrofusion Flange Adapter Stub End
US $1 / Piece
Min. Order: 500 Pieces
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2018

Suppliers with verified business licenses

Secured Trading Service
Jiangxi, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Self-branded
The supplier has 1 Self-brands, check the Audit Report for more information
Patents Awarded
The supplier had awarded 2 patents, you can check the Audit Report for more information
to see all verified strength labels (15)

Basic Info.

Model NO.
HDPE211102
Connection
Welding
Shape
Equal
Material
HDPE
Technics
Casting
Certification
ISO
Special Function
Anti Corrosion
Application
Water Supply, Pipe Lines Connect
Customized Support
OEM, ODM
Packing
Carton
Color
Customized
Transport Package
as Customer Request
Specification
20-110mm
Trademark
JUBO
Origin
Jiangxi
HS Code
3917400000
Production Capacity
20000/Day

Packaging & Delivery

Package Size
50.00cm * 50.00cm * 50.00cm
Package Gross Weight
20.000kg

Product Description

Products name
Electrofusion Stub end
Sizes Available
20-2000
2SDR
SDR11
PN
PN16
Material Brand
3490/3440
Executive Standard
EN 12201-3:2011,EN 1555-3:2010,ISO
Colors Available
Black color , blue color, Orange or as request.
Packing Method
Normal export packing. by carton
 
Production Lead Time
Depending on the order quantity.
Normally about 15-20 days for 20ft container, 30-40 days for a 40ft container.
     
Certificate
ISO, CE
     
Supply Ability
100000 Ton/Year
     
Payment Method
T/T, L/C at sight
     
Trading Method
EXW, FOB, CFR, CIF
     
Features
1. High toughness and good seismic performance;
2. The connection is reliable;
3. Low density, light weight, easy to handle and install
4. Can resist a variety of chemical media corrosion;
5. Excellent hydraulic performance, the wear resistance coefficient is only 0.009;
6. Long service life, up to 50 years;
7. Good hygiene and environmental performance;
8. Better resistance to slow crack growth (SCG) and rapid crack propagation (RCP).
HDPE Pipe Fitting Electrofusion Flange Adapter Stub EndHDPE Pipe Fitting Electrofusion Flange Adapter Stub EndHDPE Pipe Fitting Electrofusion Flange Adapter Stub EndHDPE Pipe Fitting Electrofusion Flange Adapter Stub EndHDPE Pipe Fitting Electrofusion Flange Adapter Stub EndHDPE Pipe Fitting Electrofusion Flange Adapter Stub EndHDPE Pipe Fitting Electrofusion Flange Adapter Stub EndFAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q:Is the quality of your products stable?
A:The company has a complete QC system, and each batch of products will be sampled and the samples will be kept for 5 years.
Q:Can you do OEM?
A:Yes, of course. We can produce the products as per your request.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 10-15 days if the goods are not in stock, it is according to quantity.       
Q: What is your terms of payment ?
A: Payment<=5000USD, 100% in advance. Payment>=5000USD, 30% T/T in advance,balance before shipment. If you have another question, please feel free to contact us at any time.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
HDPE Pipe Fitting Electrofusion Flange Adapter Stub End pictures & photos
HDPE Pipe Fitting Electrofusion Flange Adapter Stub End
US $1 / Piece
Min. Order: 500 Pieces
Diamond Member Since 2018

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company
Management System Certification
ISO 9001, ISO 9000, ISO 14001, ISO 14000, OHSAS/ OHSMS 18001